TRANSPORTATION PLANNING - DANVILLE MPO PROGRAM

Long-Range Transportation Plan for Year 2035
The current Long-Range Transportation Plan covers a period out to the Year 2035.  The document includes a map showing color coded segments of existing corridors where improvements are recommended and some new segments where new construction is recommended in the future sometime before Year 2035.  Also included are text and tables further detailing the recommendations. 

MPO Year 2035 Constrained Long-Range Transportation Plan Documents (CLRP):
                •  Plan
               
•  Executive Summary
               
•  Technical Report
               
•  Constrained Plan Project Listing
               
•  Constrained Plan Project Locations Map
               
•  Vision Plan Project Listing
               
•  Vision Plan Project Locations Map
               
•  Amendment to Year 2035 Constrained Long-Range Transportation Plan (March 2011)
               
•  Amendment to Year 2035 Constrained Long-Range Transportation Plan (Mt. Cross Rd-August 2011)

             

Danville MPO Study Area (Map)

Danville MPO Public Involvement/Participation Plan
               
•  Method of Providing Public Comments

Danville MPO Transportation Improvement Program (TIP):
               
• FY09-12 (8.4 MB)
            •  FY09-12 Amendment (4.5 MB)
            •  FY09-12 Amendment for Transit Funding for the Danville Transit System (Nov. 2009)
            •  Revised Transit Projects for FY 2010-2013 TIP (6/22/10)
            • 
FY 2009-2012 Amendment for Transit Funding for Danville Transit System (3/30/11)
            •  FY 2012-2015 Danville MPO TIP (5/25/11)
            •  FY 2009-2012 Amendment for Mount Cross Road (8/24/11)
            •  FY 2012-2015 Amendment for Mount Cross Road (1/19/12)

 

Amended Danville MPO FY 2012 Unified Transportation Planning Work Program (UWP)
The MPO adopted its annual Unified Transportation Planning Work Program in March 2011 with a revised UWP adopted in May 2011. 

Danville MPO Federal Obligated Funds:
               
•  FY08 (December 2008)
               
•  FY09 (November 2009)
             •  FY10 (November 2010)
             •  FY11 (November 2011)
                •  MPO Obligation Report Guide Sheet - Hampton Roads MPO Example
                •  MPO Transit System Federal Funds Obligated (October 1, 2009 - September 30, 2010)

Danville MPO:
               
•  Policy Board Membership
               
•  Technical Committee/Project Management Team
               
•  Citizens Advisory Committee
               
•  Freight Committee
               
•  Meetings
               
•  Minutes
               
  Agendas
               
•  Staff Contacts
               
•  MPO Bylaws

Listing of Projects:
               
•  FY 2011-12 MPO Corridor Studies (Underway) - Efforts will include the development of four corridor studies 
                    which will address:  a connector between Route 863 and US Route 58; a study of improvements on Route 750; an
                    access management plan for Route 58 West; and a trail connector study between two existing trails (Danville Riverwalk
                    Trail and Ringgold Depot Trail)
 
               
•  West Piedmont Regional Bicycle Plan
               
•  Six-Year Primary Highway Improvement Program
               
•  Six-Year Secondary Highway Improvement Program
               
•  U.S. Route 29 Access Management Study - MPO Area (Blairs) (VHB)
               
•  U.S. Route 29 Access Management Study - MPO Area (Tightsqueeze) (Kimley-Horn)
               
•  Iris Lane Corridor Study (URS Corp.)
               
•  Route 730 Connector Corridor Study (URS Corp.)
               
•  U.S. Route 58 West Access Management Study (HSMM)
               
•  West Main Street/Memorial Drive Access Management Study (HSMM)
               
•  VDOT's Proposed Access Management Regulations and Standards Information