TRANSPORTATION PLANNING - DANVILLE MPO PROGRAM

Long-Range Transportation Plan for Year 2035
The current Long-Range Transportation Plan covers a period out to the Year 2035.  The document includes a map showing color coded segments of existing corridors where improvements are recommended and some new segments where new construction is recommended in the future sometime before Year 2035.  Also included are text and tables further detailing the recommendations. 

MPO Year 2035 Constrained Long-Range Transportation Plan Documents (CLRP):
                  Plan
               
  Executive Summary
               
  Technical Report
               
  Constrained Plan Project Listing
               
  Constrained Plan Project Locations Map
               
  Vision Plan Project Listing
               
  Vision Plan Project Locations Map
               
  Amendment to Year 2035 Constrained Long-Range Transportation Plan (March 2011)
               
  Amendment to Year 2035 Constrained Long-Range Transportation Plan (Mt. Cross Rd-August 2011)

             

Danville MPO Study Area Map

2012 Danville MPO Study Area Map with Secondary Roads

Danville MPO Public Involvement/Participation Plan
               
  Method of Providing Public Comments
               
  Title VI Plan

Danville MPO Transportation Improvement Program (TIP):
               
 FY09-12 (8.4 MB)
              FY09-12 Amendment (4.5 MB)
              FY09-12 Amendment for Transit Funding for the Danville Transit System (Nov. 2009)
              Revised Transit Projects for FY 2010-2013 TIP (6/22/10)
             
FY 2009-2012 Amendment for Transit Funding for Danville Transit System (3/30/11)
              FY 2012-2015 Danville MPO TIP (5/25/11)
              FY 2009-2012 Amendment for Mount Cross Road (8/24/11)
              FY 2012-2015 Amendment for Mount Cross Road (1/19/12)
              FY 2012-2015 Amendment for Danville Transit System (3/29/12)
              FY 2012-2015 Amendment for Danville Transit System (9/26/12)
 

 Danville MPO  FY 2015 Unified Transportation Planning Work Program (UWP)
The MPO initially adopted its annual Unified Transportation Planning Work Program in March 2014. 

Danville MPO Federal Obligated Funds:
               
  FY08 (December 2008)
               
  FY09 (November 2009)
               FY10 (November 2010)
               FY11 (November 2011)
               FY12 Annual Report and Appendix (December 2012)
                  MPO Obligation Report Guide Sheet - Hampton Roads MPO Example
                  MPO Transit System Federal Funds Obligated (October 1, 2009 - September 30, 2010)

Danville MPO:
               
  Policy Board Membership
               
  Technical Committee/Project Management Team
               
  Citizens Advisory Committee
               
  Freight Committee
               
  Meetings
               
  Minutes
               
  Agendas
               
  Staff Contacts
               
  MPO Bylaws

Listing of Projects:
              FY 2012-13 MPO Corridor Studies (Completed June 2013) - The development of two corridor studies were
                   conducted to include:  a study of Moorefield Bridge Road (Route 863) and a study of Kentuck Road (Route 729)

       
        FY 2011-12 MPO Corridor Studies (Completed June 2012) - The development of four corridor  
                   studies included:  a connector between Route 863 and US Route 58; improvements on Mount Cross Road (Route 750); an
                   access management plan for Route 58 West; and a trail connector study between two existing trails (Danville Riverwalk
                   Trail and Ringgold Depot Trail)
 
               
  West Piedmont Regional Bicycle Plan
               
  Six-Year Primary Highway Improvement Program
               
  Six-Year Secondary Highway Improvement Program
               
  U.S. Route 29 Access Management Study - MPO Area (Blairs) (VHB)
               
  U.S. Route 29 Access Management Study - MPO Area (Tightsqueeze) (Kimley-Horn)
               
  Iris Lane Corridor Study (URS Corp.)
               
  Route 730 Connector Corridor Study (URS Corp.)
               
  U.S. Route 58 West Access Management Study (HSMM)
               
  West Main Street/Memorial Drive Access Management Study (HSMM)
               
  VDOT's Proposed Access Management Regulations and Standards Information